Did you know you can test the accuracy of your equipment before you get on site? As a manufacturer, we often get tech support calls from auditors who are on site, and wondering if their equipment is providing an accurate reading. Thankfully, there is an easy way to test both your duct tester and gauge, regardless of manufacturer, before you get on site. There is, after all, nothing worse than showing up on site, and not being confident the equipment is working properly.

For your gauge or manometer, perform a simple "Field check of tubing and digital gauges". This calibration check can be completed before an important test, checking gauge accuracy to ensure it remains within original specifications. A simple procedure of connecting both channels of the manometer to each other will allow you to verify your equipment accuracy, and check the tubing for leakage and blockage because they are also a major source of testing errors.

For the duct testing fan, you can test the accuracy with a field calibration plate - a simple 5 minute check to verify the equipment. You should check your duct tester accuracy in both directions, pressurization and depressurization, and then compare with manufacturer specifications. Ideally, your fan should provide equally accurate results in both directions. Ask your equipment manufacturer for a field calibration plate, although you can test any fan on any calibration place, or you can make your own! All you need is a plate with a hole of a known size. For instructions and the full procedure go to: http://www.retrotec.com/residential/Articles.aspx.



Views: 109

Comment

You need to be a member of Home Energy Pros Forum to add comments!

Join Home Energy Pros Forum

Comment by Dan Wildenhaus on December 16, 2010 at 12:43pm

Silvie,  Thanks for sharing the procedure!

Latest Activity

Chris Dorsi posted an event
Thumbnail

2018 Habitat X Summer National Conference at Big Sky Montana

June 27, 2016 to June 29, 2016
The 2018 Habitat…See More
2 hours ago
Stuart Langley liked David Byrnes's blog post Strategies for Hiring and Interviewing for Home Performance Professionals
6 hours ago
Kevin Miller replied to Bob Krell's discussion What Do You Do When You Find Suspected Mold? in the group Healthy Indoors (IAQ)
"Visual inspection can only confirm the presence of mold, not the absence.   That said,…"
9 hours ago
Armand C Magnelli replied to Don Fugler's discussion joining ducts in the group HVAC
"I often suggest pop-rivets as an alternative to sheet metal screws for both clothes dryer duct work…"
9 hours ago
Kevin Miller replied to Bob Krell's discussion What Do You Do When You Find Suspected Mold? in the group Healthy Indoors (IAQ)
"Sampling would be primarily to verify 'Condition 1' or 'Normal Fungal Ecology'…"
9 hours ago
Daniel Cullen joined Building Performance Institute's group
Thumbnail

Building Performance Institute (BPI)

BPI is the nation's premier standards development, quality assurance and credentialing organization…See More
10 hours ago
Daniel Cullen replied to Bob Krell's discussion What Do You Do When You Find Suspected Mold? in the group Healthy Indoors (IAQ)
"Can anyone tell me exactly HOW mold sampling impacts the mold remediation process or protocol? Why…"
10 hours ago
Daniel Cullen joined Bob Krell's group
Thumbnail

Healthy Indoors (IAQ)

The Healthy Indoors group is focused on indoor air quality (IAQ), mold, moisture control, radon,…See More
10 hours ago

Photos

  • Add Photos
  • View All

© 2017   Created by Home Performance Coalition (HPC)   Powered by

Badges  |  Report an Issue  |  Terms of Service