I have a client who needs your help. In the early 80's, he and his wife built a beautiful off-grid home on a small island near Fort Myers, FL. It currently serves as a convenient getaway, but as they approach retirement, they want to install a limited amount of air conditioning in the form of a couple of small, high-SEER ductless mini-splits.

The aging 12V PV system is quite small -- the refrigerator is propane powered, and there's no well (fresh water supplied by rainwater collection). So he's going to need to upgrade the power system to support the mini-splits. To keep costs reasonable, some envelope improvements are warranted.

It turns out, the gorilla in the room is the uninsulated metal roof. It's supported by beautiful site-built beam trusses and the exposed roof panels serve as a decorative ceiling. You can only imagine how hot that surface gets, making the home virtually uninhabitable for 4 or 5 months a year.

I'm not sure what's the best approach to insulate this roof. The owner wants to avoid pulling up the existing roof, which is seriously bolted down, successfully weathering Hurricanes Wilma & Charley and numerous tropical storms. Moreover, the owners have a strong preference for preserving the aesthetics of the exposed metal interior, which means working from above.

I'm thinking 4" of XPS or poly-iso covered by another metal over-roof. Keep in mind the roof serves as primary collector for fresh water so shingles are a no-go (aside from blow-off risk from the inevitable storms). However, I don't know enough about this to advise on attachment and edge details. Nor do I have a feel for cost, other than it seems obvious that working from below would be less expensive since it wouldn't be structural and he could use a less expensive insulation product.

I've attached several images for reference. I know we have some savvy retrofit gurus among the membership. I'd appreciate your advice!

Views: 1034

Attachments:

Reply to This

Replies to This Discussion

Bill, I was trying to keep a gap between the metal roof and insulation for air movement and to allow a cooler insulation on contact. I had a ureathane company for 13 years and cannot stress more strongly don't install it inside the envelope. The  distance between the 2 purlins compressing the foam with long screws staggered will transmit wind shear to original structure. Best of luck. PS. long screws have to be larger diameter for adequate shear transfer of wind loads ex.. 6" should be #14 at least.

RSS

Latest Activity

Dannie Jackson liked Barry NewDelman's discussion Help your Clients save, THEN do what you do best
5 minutes ago
Dannie Jackson replied to Barry NewDelman's discussion Whats the Consensus of this group Define "Energy Efficiency" in the group Energy Efficient Design
"Design wise I would say that energy efficiency is defined by the Btu / square foot.  This is…"
8 minutes ago
Dannie Jackson joined Chris Laumer-Giddens's group
Thumbnail

Energy Efficient Design

Energy efficiency starts at the drafting table...How architects and designers can help buildings…See More
8 minutes ago
Dannie Jackson liked Chris Laumer-Giddens's group Energy Efficient Design
34 minutes ago
Dannie Jackson posted a blog post
1 hour ago
Dannie Jackson liked Home Performance Coalition's blog post Building a Market for High-Performing Homes
2 hours ago
Summer Reyes posted a blog post
17 hours ago
Oliver Periman is now a member of Home Energy Pros Forum
yesterday

Photos

  • Add Photos
  • View All

© 2017   Created by Home Performance Coalition (HPC)   Powered by

Badges  |  Report an Issue  |  Terms of Service